Supplement Factory System

Pet Supplement Factory System

Soft chews, tablets, powders, and packaging workflow planned from Xinji GMP workshop and supplement manufacturing experience.

Pet Supplement Factory System equipment system

Process Flow

  1. Formula review
  2. Premix handling
  3. Blending
  4. Forming / tableting / filling
  5. Drying or curing
  6. Metal detection
  7. Counting and packing
  8. Batch traceability

Production Lines

Soft chews line

Best for palatable functional products where texture, dosage, and packing quality matter.

Key equipment

Premix station, mixer, soft chew forming, curing, inspection, pouch or jar packing.

Tablets line

Best for stable active ingredients and measured dosage with bottle packing.

Key equipment

Blender, granulation if required, tablet press, deduster, counter, bottle packing.

Powders line

Best for flexible formula batches and staged factory entry.

Key equipment

Premix handling, blender, sifter, metal detector, powder filler, pouch or jar packing.

Equipment System

Core equipment package

Premix station

Selected by capacity, material route, automation level, utility load, and local maintenance plan.

High-shear mixer

Selected by capacity, material route, automation level, utility load, and local maintenance plan.

Soft chew forming machine

Selected by capacity, material route, automation level, utility load, and local maintenance plan.

Tablet press

Selected by capacity, material route, automation level, utility load, and local maintenance plan.

Powder filling line

Selected by capacity, material route, automation level, utility load, and local maintenance plan.

Bottle or pouch packing line

Selected by capacity, material route, automation level, utility load, and local maintenance plan.

Layout and Market Logic

System planning changes with utilities, materials, QC, and export route

Layout Zones

  • Premix and weighing
  • Blending
  • Forming / tableting / filling
  • Curing or conditioning
  • Inspection
  • Counting and packing

Utility Requirements

  • Electric power
  • Compressed air
  • Temperature and humidity control
  • Cleanable surfaces
  • Traceability and batch records

Market Planning Notes

  • Functional products require cleaner claim boundaries, ingredient records, retention samples, and batch traceability.
  • Soft chew projects should confirm texture, palatability, curing time, water activity, and pouch or jar stability before equipment sizing.
  • Powder and tablet projects usually need more precise weighing, dust control, counting, and cleaning changeover planning.
Factory Layout Discussion

Request a layout planning model for your target capacity.

A project layout should be prepared after country, material, capacity, building size, utility, and land constraints are confirmed.

Discuss Layout